Blog

Studio III architects adopts The 2030 Challenge

Studio III architects has adopted the 2030 Challenge!

The primary objectives of the 2030 Challenge are:

– to achieve the dramatic reduction in global fossil fuel consumption and GHG emissions of the built environment by changing the way cities, communities, infrastructure, and buildings, are planned, designed, and constructed and;

– the regional development of an adaptive, resilient built environment that can manage the impacts of climate change, preserve natural resources, and access low-cost, renewable energy resources.

Studio III is committed to contributing to a sustainable built environment, providing Passive House and Energy Star rated buildings.

Please check out this great video about The 2030 Challenge:  https://vimeo.com/22702981

…and here’s a link to The 2030 Challenge website

and a list of firms that have adopted the challenge, including Studio III!

 

…and a very happy, healthy New Year to everyone, from Studio III!

 

Educating the Next Generation – The Passive House Gets a Visit

Just before Thanksgiving, the Passive House was graced by students from the STEM Academy, part of the Patricia A. Hannaford Career Center in Middlebury, VT. For anyone interested in pursuing careers in engineering and architecture, the opportunity to tour a Passive House is a chance to see the future of building standards in action. The students were guided by lead architect Gregor Masefield, founder of Studio III Architecture, and lead builder Chris North, co-owner of Northern Timbers Construction.

Compared to Europe, where an industry for passive building has been developing since the first Passivhaus was built in Darmstadt, Germany in 1991, passive building in the United States is in its infancy. PHIUS’s database lists about 150 certified projects across the county, with only 5 in Vermont. This house will be the 6th. Meanwhile, passive buildings in Europe number in the tens of thousands. The industry there is so well-established that construction of a passive building in Germany only costs 5-7% more than a regular building, a cost that is more than made up for by energy savings over the life of the building. But even in the US construction costs only run 5-10% more for new buildings, and those costs continue to go down as the industry expands and more people come to recognize the value of the PH standard.

As a consumer, you might think, “Housing is expensive as is. Why should I bother with the higher cost of construction when fuel is so cheap right now?” The price of fuel changes as often as the weather; nothing can guarantee today’s low prices won’t disappear with the next political crisis. But more to the point, we can no longer pretend that our current low standards of building are even remotely sustainable, and it is impossible to ignore the effects of poor construction on the global climate. With the international climate talks beginning today in Paris, the time is ripe for a dramatic shift in the way consumers look at construction.

One day, the Passive House standard will be the minimum requirement for building. The sooner people adopt it not just as a building code, but as a cultural mindset, the better it will be for everyone. We hope the students came away from this tour with some insight into the exciting challenges they’ll encounter.

20151124_10034020151124_09051420151124_09071720151124_09212920151124_101011

 

Passive House Construction Continues – Blower Door Test Results

At our last update, penetrations for the utilities had been installed, the TJI’s were almost completely installed, and the windows were about to be installed. Construction was thus approaching a critical milestone: the first blower door test. The test is simple: a box fan with a precision pressure measurement device (called a manometer) is installed and sealed to the front door opening. All the other doors and windows are closed, and the fan is turned on. The manometer then tells us how much air is escaping the building given the pressure created by the fan.

Last week we conducted the first blower door test. At a pressure of 50 Pascals, by US standards we wanted no more than 1 air change per hour (ACH). By European standards, no more than .6 ACH. The results of our blower door test?

.28 ACH. Although even the US standard is high by comparison to typical construction and detailing, we not only met the higher European standard, we far surpassed it. This is a remarkable achievement and a testament to the effort Northern Timbers Construction is putting into this house.

And now construction can continue – exterior sheathing is already almost finished. This sheathing is the last side of the box that will be filled with dense-pack cellulose insulation. It also provides a drainage plain for water. Vertical furring strips are the last step before the exterior cladding. After the blower door test, we’re more excited than ever to see this house finished.

IMAG1102 IMAG1103 IMAG1106 IMAG1110 IMAG1111

Passive House Construction Continues – 9/25/15

Framing continues at the Passive House. The once cavernous interior space has given way to more recognizable rooms. Along with pipes and electricity, the guts of the high-efficiency air exchange unit by Zehnder are on display. On the exterior, the window frames and TJIs have just finished being installed.  The TJIs serve two purposes: They define the box that will hold about a foot of dense-packed cellulose insulation, critical to achieving a high R-Value; and they provide the structure for the siding. However, it will be some time before the siding can be installed. First we must conduct a blower door test. There are two over the course of construction, and now that the TJIs are installed the first is right around the corner.

The house is getting closer to its final shape, but there’s still much to be done for it to be certified “Passive”.

L1060192 L1060201 L1060227 IMAG0920 IMAG1072

Passive House Construction Continues – 9/2/15

After the slow but steady pace of the foundation’s construction, the rest of the house seems to spring up while your head is turned. The posts one week, then the floor trusses the next, and most recently the balloon framing and roof trusses. The second floor trusses are next in line and will more fully define the interior space. The rough openings of the windows are already framing beautiful views of the outdoors.

But a good aesthetic is just one of the goals we’re aiming for in building this house. To be certified as a true Passive House, construction is being held to a rigorously high standard. The blue tape is a part of that – it is being used to close every gap between the interior and exterior of the house. By the end of construction, the house will be a sealed bubble with next to no air infiltration.

Winter in Vermont is a beautiful thing, but it doesn’t need to follow you into your home.

L1060093 L1060114 L1060117 L1060143 L1060180 IMAG0872 IMAG0874